Pedestrian Bridge Fabrication & Installation
A full turnkey pedestrian bridge project delivered by SolidWorks Construction WLL. The scope included complete steel structure fabrication, sectional pre-assembly, surface preparation, protective coating, onsite lifting operations, and final installation.
GCC Region
Construction & EPC
Full turnkey project

The Challenge
A full turnkey pedestrian bridge project delivered by SolidWorks Construction WLL. The scope included complete steel structure fabrication, sectional pre-assembly, surface preparation, protective coating, onsite lifting operations, and final installation.
Our Solution
The bridge was erected using synchronized crane lifting operations with strict adherence to safety protocols and traffic management requirements. The project required multi-discipline coordination, precision alignment of pre-fabricated modules, controlled heavy lifting, and integration with existing civil works. Activities covered fabrication, logistics planning, erection, welding, bolting, quality inspection, and final handover.
Project Gallery

Logistics & Documentation
Tonnage
Full turnkey project
Shipping Method
On-site fabrication and installation
Incoterm
DDP Site
Timeline
Complete project delivery
Documentation
Project documentation, quality certificates, handover documents
Quality Assurance Process
Steel structure fabrication quality control
Pre-assembly verification
Surface preparation and coating inspection
Lifting operation safety protocols
Alignment and installation verification
Final quality inspection and handover
Project Outcomes
Delivery
Project completed successfully
Cost Savings
Efficient turnkey delivery
Quality Compliance
Built to meet applicable local safety and engineering standards